Selected References Process Basic Design

Revamping Vacuum LCF

Details

Year

2014

Client

Raffineria di Milazzo S.p.a.

Refinery

Milazzo Refinery

Location

Milazzo - ITALY

Plant

Units 024

Unit Capacity

110753 kg/h

Scope

Verify the vacuum tower, the vacuum tower ejector system, pipes, instrumentation, heat exchanger system at 100% and 120% of design condition and at a new operating pressure of the vacuum tower.

Our Work

  • Carry out a thermodinamic simulation of the Vacuum Unit
  • Verify existing heat exchanger system
  • Verify columns internals
  • Design of new equipments (heat exchangers, pipes, PSV, instrumentation)
  • Verify the existing hydraulic system at new condition