Selected References Basic Engineering Design

Revamping of existing Vacuum Unit

Details

Year

2013

Client

Alma Petroli S.p.a.

Refinery

Alma Petroli Refinery

Location

Ravenna - ITALY

Plant

Units 001

Scope

The Purpose of the project was a design of a new vacuum tower substituting the present column. The new column has been designed considering a future larger capacity. In addition GST checked the old heat exchanger system considering the new and more critical operating conditions.

Our Work

  • Carry out thermodinamic simulations of the Vacuum Units
  • Verify existing heat exchanger system
  • Design of new equipments (heat exchangers, PSV, instrumentation)
  • Verify the hydraulics of all systems at new condition
  • Cost estimation